LMRC Various Vacancy 183 Posts updated on 13th August 2022

Lucknow Metro is a rapid transit system serving the city of Lucknow in the Indian state of Uttar Pradesh. Construction of the line begun on 27 September 2014 with the 8.5 km (5.3 mi) stretch from Transport Nagar to Charbagh Railway Station which began its commercial operation on 5 September 2017, making it the fastest built metro rail system in the country. Full operation on Red Line stretch from Chaudhary Charan Singh International Airport metro station to Munshi Pulia metro station began operation on 9 March 2019. The Lucknow metro cover a distance of 22.87 km with 22 stations. It is the eighth longest operational metro network in India after the Delhi Metro, Hyderabad Metro , Chennai Metro, Namma Metro , Noida Metro, Kolkata Metro and Kochi Metro.

Various Vacancies 2020

Brief Information of this Sarkari Job in 2020

Lucknow Metro Rail Corporation Limited (LMRC) (UP Metro Rail Corporation Ltd.) has published notification for the recruitment of Assistant Manager, Jr Engineer& Public Relations Assistant vacancies in Executive and Non Executive Category. Those Candidates who are interested in the vacancy details & completed all eligibility criteria can read the Notification & Apply Online.

Last Date31-Dec-2019
Advertisement No.18/2019
Post NameLMRC Various Vacancy Exam Result & Marks Released 2020
Total Vacancies183
LocationLucknow, Uttar Pradesh, India
Fee DetailsFor UR/ OBC Candidates: Rs.590/- (inclusive GST @ 18% & exclusive of bank charges) For SC/ST candidates: Rs. 236/- (inclusive GST @ 18% & exclusive of bank charges) Payment Mode: Online/ Offline

Vacancy Details of this Sarkari Job in 2020

Sr.Post NameNo.of PostsQualificationAge Limit
1 Assistant Manager/ (Civil) 28B.E/ B.Tech (Civil Engg)21 to 28 Years
2Assistant Manager/ (Electrical)18B.E/ B.Tech (Electrical or Electrical & Electronics Engineering)21 to 28 Years
3Assistant Manager/ (Accounts)06CA or ICWA21 to 28 Years
4Assistant Manager/ (S&T) 08B.E/ B.Tech (Electronics/Electronics & Communication)21 to 28 Years
5Assistant Manager/ (HR)02MBA (HR) or PGDM (HR)21 to 28 Years
6Jr Engineer/(Civil)58Diploma (Civil Engineering)21 to 28 Years
7Assistant Manager/ (Public Relations)02Master (Mass Communication & Journalism or Journalism)21 to 28 Years
8Jr Engineer/ (Electrical) 40Diploma (Electrical Engineering or Electrical & Electronics Engineering)21 to 28 Years
9Jr Engineer/(S&T) 17Diploma (Electronics/ Electronics & Communication)21 to 28 Years
10Public Relations Assistant04Bachelor Degree (Mass Communication & Journalism or Journalism)21 to 28 Years

Dates to Remember for this Govt. Job

Start Date22-Nov-2019
End Date31-Dec-2019
Date of Advertisement26-Dec-2019
Latest Update17/05/2020
Date for Download Admit Card10-01-2020
Tentative Date for Written Exam (CBT)20 & 22-01-2020
Dates for Online Objections25-01-2020 to 30-01-2020

The Lucknow Metro Rail Corporation (LMRC) has hired 35 customer relation assistants to assist commuters, especially senior citizens in getting tickets. LMRC has also provided free RO drinking water, toilets, escalators and lifts at all the stations.

The Lucknow metro project is the most expensive transport system in Uttar Pradesh to date with an estimated total cost for Phase 1A (Red Line) and 1B (Blue Line) of about $2 billion, of which ₹6,928 crore (US$970 million) is being spent on phase 1A. The Lucknow Metro Rail Corporation, a 50:50 joint venture between the Government of India and the Government of Uttar Pradesh, was established to build and operate the metro.

Once completed, the Lucknow Metro will have 2 Lines (1A & 1B), the longer Red (North-South) line, running from Chaudhary Charan Singh International Airport to Munshi Pulia chauraha with a total length of 22.87 km (14.21 mi), and the Blue (East-West) line, running from Charbagh Railway Station to Vasant Kunj. Charbagh Railway Station will serve as the junction station between the two lines. Further, Metro Phase 2 & 3 will consist of 6 lines of 74 km. Phase 2 will be of 3 lines from IIM Lucknow to Rajajipuram, Indira Nagar to CG City and CG City to CCS International Airport. Phase 3 will be of 3 lines from Munshipulia to Jankipuram, Charbagh to SGPGI and Sachivalaya to CG City. Phase 4 will further see metro expanding to outer areas and to satellite towns.

The current phase that is completed is between Munshi Pulia and Chaudhary Charan Singh International Airport. The time that it takes to go from one end to another is approximately 50 Minutes with a maximum fare of ₹60.

You may also like...

Leave a Reply