Vizag Steel Plant – RINL Management Trainee 188 Jobs updated on 12th August 2022

Visakhapatnam Steel Plant, popularly known as Vizag Steel, is an integrated steel producer in Visakhapatnam, India built using German and Soviet technology. The company has grown from a loss-making industry to 3-billion-dollar turnover company registering a growth of 203.6% in just four years. Vizag Steel Plant was conferred Navratna status on 17 November 2010. Founded in 1971, the company focuses on producing value-added steel, with 214,000 tonnes produced in August 2010, out of 252,000 tonnes total of saleable steel produced.

Management Trainee Vacancies 2020

Brief Information of this Sarkari Job in 2020

Vizag Steel Plant – Rashtriya Ispat Nigam Limited (RINL) has announced notification for the recruitment of Management Trainee (Technical) vacancies. Those Candidates who are interested in the vacancy details & completed all eligibility criteria can read the Notification & Apply Online.

Last Date13-Feb-2020
Advertisement No.01/2020
Post NameVizag Steel Plant – RINL Management Trainee Online Form 2020
Total Vacancies188
LocationHyderabad, India
Fee DetailsFor UR/ OBC: Rs. 590/- (Including GST @18%) For SC/ PwD: Rs. 295/- (Including GST @18%) Payment Mode: Debit Card/ Credit Card/ Net Banking.

Vacancy Details of this Sarkari Job in 2020

Sr.Post NameNo.of PostsQualificationAge Limit
1Mining02Be/ B.Tech (Relevent Experience) upto 27 yrs
2Metallurgy19Be/ B.Tech (Relevent Experience) upto 27 yrs
3Mechanical77Be/ B.Tech (Relevent Experience) upto 27 yrs
4Electrical45Be/ B.Tech (Relevent Experience) upto 27 yrs
5Instrumentation & Electronics10Be/ B.Tech (Relevent Experience) upto 27 yrs
6Chemical26Be/ B.Tech (Relevent Experience) upto 27 yrs
7Civil05Be/ B.Tech (Relevent Experience) upto 27 yrs
8Ceramics04Be/ B.Tech (Relevent Experience) upto 27 yrs

Important Links related to this Sarkari Naukri

View Job Details
View Offcial Notification
View Apply Now

Dates to Remember for this Govt. Job

Start Date24-Jan-2020
End Date13-Feb-2020
Date of Advertisement17-Jan-2020
Closing Date for Payment Gateway14-02-2020
Latest Update24-01-2020

History

On 17 April 1970, the Prime Minister of India, the Indira Gandhi, announced the government’s decision to establish a steel plant at Visakhapatnam. With the offer of assistance from the government of the erstwhile USSR, a revised project evolved some years later. A detailed project report for a plant with a capacity of 3.4 Mtpa was prepared in November 1980 and in February 1981, a contract was signed with the USSR for the preparation of working drawings of coke ovens, blast furnace and sinter plant. The blast furnace foundation was laid, with first mass concreting, in January 1982. The construction of the local township was also started at the same time.

In the 1970s, Kurupam Zamindars donated 6,000 acres of land for Vizag Steel Plant. A new company Rashtriya Ispat Nigam Limited (RINL) was formed on 18 February 1982. Visakhapatnam Steel Plant was separated from SAIL and RINL was made the corporate entity of Visakhapatnam Steel Plant in April 1982.

Vizag Steel Plant is the only Indian shore-based steel plant and is situated on 33,000 acres (13,000 ha), and is poised to expand to produce up to 20 MT in a single campus. Turnover in 2011-2012 was Rs 14,457 crores. On 20 May 2009, Prime Minister Manmohan Singh launched the expansion project of Visakhapatnam Steel Plant from a capacity of 3.6 MT to 6.3 MT at a cost of Rs. 8,692 crores.

You may also like...

Leave a Reply